Westfield Miranda



About

The 19,000m2 expansion of Westfield Miranda was completed in 2015 taking the centre to a total  gross lettable area 127,000m2. Key features of the redeveloped centre included a three level galleria fashion mall connecting between an upgraded David Jones and refurbished Myer,  10-screen multiplex Event cinema and rooftop restaurants.

Brighton was contracted to design and construct the plasterboard, timber cladded and metal blade ceilings, plasterboard and Himacs internal linings, Europanel, fibre cement and aluminium composite panel exterior linings.


External

Internal